07867 607089 info@cjbpiling.co.uk

Professional CFA Piling Contractors

CFA piling is one of the most common piling methods for building foundations. This technique is widely used for the construction of residential and commercial buildings, and infrastructure projects. This piling procedure produces minimum noise and vibrations, making it appropriate for use in built-up, eco-friendly, and metropolitan areas.

CJB Piling offers fully efficient and certified CFA piling services to build strong, durable foundations that last a long time. Our licenced engineers can efficiently install concrete piles beneath the surface to supply the needed functional support and durability for supporting large-scale constructions.

Why Choose Us

CJB Piling and Underpinning boasts a staggering 20 years of experience, cutting-edge machinery, and an expert team of engineers to provide unmatchable piling services. Our hallmarks include:

Modern Equipment

We have state-of-the-art piling rigs and machines to ensure a top-class service.

Specialist Team

Our engineers possess a robust skillset to provide specialised solutions

Quality Materials

Highest quality of materials to ensure structural robustness & durability.

24/7 support

Our experts are available round the clock to promptly deal with your queries.

Why Use CFA Piling?

There are several benefits of CFA piling that make them the right choice for laying robust foundational structures:

      • Minimal Disturbance
      • Soil Retention
      • Robust Structural Reinforcement
      • A Wide Variety of Auger Sizes
      • Minimal Noise & Vibrations
      • Simple and Easy Installation Procedure
      • Economical & Cost-Effective Piling Solution
      • Ideal for Challenging Soil Conditions

How Is CFA Piling Done?

Our experts follow these steps to lay durable and effective CFA piles: 

      • Ground Drilling: In the first step, a hollow stem auger is used to drill the ground to the needed depth.
      • Filling of Drilled Area: The drilled area will be filled with concrete or grout as the auger is slowly lifted upward
      • Auger Extraction: After that auger will be extracted in a rotating motion to eliminate the excess soil material.
      • Extending of Concrete: The concrete will be extended to the surface level.
      • Installation: In the last step steel reinforcement cage will be installed within the wet concrete for the structural formation.
Piling in London

Take a look at CJB Piling & Underpinning

Why Choose Us?

Different factors make our company one of the top choices for CFA piling: 

        • Experienced Specialists: CJB Piling has highly trained and experienced CFA piling contractors who aim to offer top-notch piling services to their clients.
        • Diverse Services at Competitive Costs: CJB Piling offers a broad range of services at highly economical costs without compromising the quality.
        • High-Tech Equipment: Our team use the state-of -the-art equipment and technology for the accurate and efficient conducting of all piling operations.
        • Professional Engineers: All of our engineers are fully licensed and certified, strictly adhering to the latest industry practices and standards.It has always been our top priority to give our clients a satisfied and pleasant experience.

      Contact Us Today!

      Contact CJB Piling now. We offer full value-for-money CFA piling services for commercial or residential clients.

FAQs

What are the depth limits of a CFA pile?
CFA piles can be installed up to 25m in length approximately. It clearly shows that piling is efficient for light to moderate loads, making it ideal for both residential and commercial projects.
What is the diameter range of a CFA pile?

Most of the CFA piles have diameters between 450mm and 1200mm, and they are useful in reaching over 35m of depth.

How much spacing is required for the installation of a CFA pile near a construction?

If a constructed structure or building is already present and you want to install CFA piles near it, then a minimum spacing of 5-8 pile diameters between the construction and newly installed piles is necessary.

What are the areas in which we can effectively use the CFA piling technique?

The CFA piling method can be used in various areas:

  • High-Density Areas
  • Sound Sensitive Locations
  • Eco-Friendly Construction Areas

REQUEST A CALL BACK

Request a call back and we will get back to you as soon as possible.

Based in London, we cover the whole of the UK. We specialise in piling and underpinning and general groundworks.

CONTACT INFORMATION

Phone: 07867 607089
Email: info@cjbpiling.co.uk
Address: 124 City Road, London, England, EC1V 2NX

GALLERY